Tender84
🧭 Browse
By State By Department By City By Sector By Portals Closing Today High-Value India + GTE Near You — Sign in to personalize
📚 Resources
How to File Tender CPP Portal Guide Vendor Registration DSC Guide EMD Guide GeM Guide Procurement Glossary What is PAI? Free Tools Tender Directory
💼 Services
Professional Services Plans & Pricing
🏢 Company
About Us Contact Us Legal
📞 Support
Login
Support

Minimum Safe Bid Calculator

Smart bid calculation tool for contractors — simple or advanced mode

1
Project Info
2
Costs
3
Profit & Risk
4
Financials
5
Review
Project Information
💡 Tip: Select a preset to auto-fill typical costs for your project size. You can adjust any value.

This helps calculate percentage-based costs automatically
Cost Breakdown Enter all costs that go into your project. Use absolute amounts (₹) or percentages (%).
Total Costs: 0%
Cost Head All the money you'll spend on this project Amount (₹) Mode or (%)
Material & Supplies Cost of all materials (cement, steel, paint, etc.)
Labour & Wages Wages for workers, skilled labor, daily wages
Logistics & Transport Truck, equipment rental, fuel for movement
Permits & Licenses License fees, approvals, legal documentation
Other Costs Insurance, inspection fees, miscellaneous expenses
Your Profit & Risk
%
Typical range: 5-15%
%
Typical range: 2-5%
How these work together:
Your bid = (All Costs × (1 + Risk%)) × (1 + Profit%)
Taxes & Payment Terms
%
%
%
Typical: 10-15%
days
Typical: 30-90 days

Your Bid Results
Enter project details to see your profit
🔒 Minimum Safe Bid (No Profit)
₹ 0
This is the absolute minimum. You break even but make no profit.
✅ Your Target Bid (With Profit)
₹ 0
+8% profit margin
⚡ Aggressive Bid (Lower Profit)
₹ 0
For competitive scenarios. Half your normal margin.

Total Direct Costs
₹ 0
Finance Cost (for payment delay)
₹ 0
Risk Buffer (safety margin)
₹ 0
Total Costs (Loaded)
₹ 0
Bid with GST ₹ 0
Net after TDS ₹ 0
Profit Amount ₹ 0
Profit Margin % --%

Your Maximum Bid ₹ 0
Target Bid ₹ 0
Margin at Ceiling --%

Export detailed breakdown for records
Bidding Tips
  • Include everything: All costs, even small ones add up
  • Be realistic: Use actual market prices for materials & labor
  • Account for delays: Longer payment terms = higher costs
  • Check taxes: GST & TDS vary by region and service type
  • Add buffer: 2-5% for unexpected expenses
Bid Summary & Review
Project Overview
Estimated Value: ₹ 0
Total Costs: ₹ 0
Desired Margin: 8%
Cost Breakdown
Final Bid Details
Target Bid (with GST): ₹ 0
Net Receipt after TDS: ₹ 0
Estimated Profit: ₹ 0
Profit Margin: --%
Bid Comparison
Minimum Safe Bid: ₹ 0
Aggressive Bid: ₹ 0
How to Use This Calculator
Step-by-Step Usage Guide
  1. Project Information: Enter the total estimated value of the project. This is used as a reference for percentage-based calculations.
  2. Cost Breakdown: For each cost head, you can enter either an absolute amount (₹) or a percentage (%) of the total estimated value. Use the toggle switch for each head to choose the input mode. Common cost heads include:
    • Material Cost: Cost of all materials required
    • Labour Cost: Wages for all workers
    • Transportation: Costs for moving materials and workers
    • Legal & Documentation: Fees for permits, licenses, and legal services
    • Lobbying & Misc.: Other indirect costs
  3. Profit & Risk: Set your desired profit margin and add a risk buffer for unexpected expenses.
  4. Financial Terms: Enter tax and payment details including TDS, GST, payment delay, and interest rate.
  5. Review & Finalize: Check the bid summary, adjust any inputs if needed, and save/print your bid.
Usage Example
Inputs
Estimated Tender Value₹5,160,000
Material Cost40%
Labour Cost30%
Transportation10%
Legal & Documentation5%
Lobbying & Misc.5%
Total Costs90%
Risk Buffer3%
Desired Margin8%
Payment Delay60 days @ 12%
Bid Ceiling₹7,00,000
Outputs
Finance Cost₹14,795 (1.97%)
Risk Buffer₹22,500 (3%)
Total Loaded Cost₹7,87,295
No-loss Bid₹7,87,295
Target Bid (+8%)₹8,50,279
Margin on Revenue7.4%
Margin on Cost13.3%
vs. Estimate−14.97%
Ceiling Check❌ Over by ₹1,50,279
Reading: Your costs are too high to fit the ₹7,00,000 ceiling with any margin. You need to cut costs by ~₹87,295 just to break even at the ceiling.
Important Notes:
- This calculator is for planning purposes only. Actual costs may vary.
- Always verify GST and TDS rates with current tax laws.
- Consider additional costs like insurance, permits, and overheads.
- The risk buffer should account for unexpected expenses and price fluctuations.